Skip to main navigation Skip to search Skip to main content

Animation-based construction schedule review

  • University of Colorado Boulder

Research output: Contribution to journalArticlepeer-review

17 Scopus citations

Abstract

Three-dimensional (3-D) computer aided design (CAD) and its integration with project schedules (4-D CAD) are promising technologies in design and construction. This paper represents a second study on the effectiveness of visualization on project planning. While the initial study investigated 2-D, 3-D and walk-thru technologies’ impact on project schedule development, the subsequent study reported herein, focuses on the impact of 3-D/4-D visualization on project schedule review. Experimental results provide quantitative evidence of the advantages of 3-D/4-D representations for schedule review for construction projects.

Original languageEnglish
Pages (from-to)181-190
Number of pages10
JournalConstruction Innovation
Volume1
Issue number3
DOIs
StatePublished - 1 Sep 2001

Keywords

  • 3-D CAD
  • 4-D CAD
  • Planning
  • Project management
  • Scheduling
  • Walk-thru

Fingerprint

Dive into the research topics of 'Animation-based construction schedule review'. Together they form a unique fingerprint.

Cite this